11mln tons

WE TRANSFORM STEELWORKS WASTE FROM HEADACHE INTO INCOME






Of slag have already been processed by our equipment
ARE YOU SURE, YOU PROCESS
YOUR SLAG EFFECTIVELY?
Losing 1% at recovery of iron-bearing material results in losing USD 50 thousands per year* (* subject to annual processing of 1 mln tons)
FIND OUT MORE ABOUT THE MOST EFFECTIVE
SLAG PROCESSING
Contact our expert right now!
HOLDING «SMARTSCRAP»
We have processed 11 slag disposal areas containing slag of different structure and
composition (from open-hearth furnace slag to municipal solid waste and
industrial waste landfills)
CLIENTS' FREQUENT SITUATIONS
A company acquires a slag disposal area. The company has no experience in slag processing. Among the employees, there is a manufacturing expert that has experience in processing some other type of waste at best. However, he has no knowledge in designing any crushing and screening equipment. Here, the creativity begins… Choosing what type of crusher: mobile unit or fixed plant? Who will be the manufacturer? How about producing marketable material first, and then figure out what to do with the rest? The company starts shipping scrap to plants, and the plants get back with 40-50% impurities. The company deals with all kinds of minor equipment breakages and loses precious time for parts replacement. The owner starts asking questions, where is the profit? And only 4 years later, the company gets the hang of it and starts receiving profit from the project.
A smelter decides to process its own slag. But it's not up-market to do the waste recycling, so persons responsible for this project are usually assigned based on the "leftover principle". Normally, the owner is not interested in controlling the efficiency of waste processing activities. He is more into dealing with strategic objectives of increasing the production capacity. And what about the slag? At best, it repays the investments made. Nobody controls its efficiency, stealing is thriving. The company loses money that could be so useful in these times of crisis.
A smelter takes the environmental challenge. The owner said that the slag disposal area had to be cleared in 2 years. A tender was hold, and high-priced equipment was purchased from European vendors. A contractor has manufactured and installed the equipment in a responsible manner according to the available drawings and customer's terms of reference. However, nobody thought of waste structure and composition. The works started, but the estimated Fe recovery values yet cannot be reached. And we're lucky if this figure is being monitored at all, because the owner has more challenging tasks than production waste. The slag processing is being performed within the scheduled dates. Third parties buy crushed stone of poor quality which they then process to recover expensive iron-bearing material. The plant loses money that could be so useful in these times of crisis.
WHY WE ARE EFFICIENT:
Slag is processed only once and is separated by different products!
More:
Annual capacity from 300000 to 2 mln tons of slag
01
Scale
We manufacture customized equipment for specific projects
Our company has worldwide presence
The equipment is custom-built and manufactured for each individual facility to satisfy customer objectives
Starting from 2006, we have processed 8 mln tons of slag at 7 different facilities using our own designed and manufactured equipment
It satisfies the most sophisticated customer requirements. One of our customers uses up to 50% of product instead of scrap metal.
Our equipment is made of absolutely standard modules and units which allows minimizing the equipment downtime. Total downtime of the equipment does not exceed 40 hours per month
Our equipment allows recovering up to 20% more iron compared to competitors equipment
02
Manufacturer
03
Maximum Fe Recovery
04
Maintainability
Product Quality
Experience
Customized Approach
Geography
05
06
07
08
OTHER COMPLETED PROJECTS
INTEGRATED WASTE RECULTIVATION OF NDTZ PIPE PLANT NAMED AFTER K. LIBKNEKHT

INTEGRATED WASTE RECULTIVATION OF NDTZ PIPE PLANT NAMED AFTER K. LIBKNEKHT
20/08/2008
01
INTEGRATED WASTE RECULTIVATION OF KHARKOV TRACTOR PLANT
KHARKOF
02
INTEGRATED WASTE RECULTIVATION OF TAGANROG IRON & STEEL WORKS
TAGANROG
20/09/2014
03
WASTE RECULTIVATION OF NOVOLIPETSK IRON & STEEL WORKS GROUP

NOVOLIPETSK
04
WASTE RECYCLING FROM INDUSTRIAL WASTE LANDFILL OF THE CITY OF SUMY
SUMY
20/12/2016
05
PROCESSING OF METALLURGICAL PRODUCTION WASTES OF KUZLIT PLANT

    06
    20/09/2014
    NOVOLIPETSK
    20/09/2014
    MILESTONES
    For manufacturing and selling the crushing and screening plant
    ВA field visit to evaluate the structure and composition of the slag disposal area. 1 week provided that there are specialists available
    Designing the crushing and screening plant and the production process.
    2 weeks
    Signing a contract
    (depends on customer)
    Manufacturing and installation of the crushing and screening plant.
    4-6 months
    Equipment setup.
    1 month.
    Plant delivery to the customer
    On-site designer supervision
    (recommended)
    Receiving an order application
    .................................
    .................................
    .................................
    .................................
    .................................
    .................................
    .................................
    01
    02
    03
    04
    05
    06
    07
    08
    .................................
    .................................
    Contact Us
    WhatsApp
    Made on
    Tilda